-
3D Modeling CD8
3D modeling in Solid Works of the siphon refractories of the Recovery Boiler 8 (CD8) of Klabin, Monte Alegre unit.
-
Cerrado - EVAP
Civil project for “Evaporation”, in the chemical recovery area, of the largest factory in the pulp segment world.
-
Cerrado - Fiber Line
Fiber Line for the pulp and paper industry in the municipality of Ribas do Rio Pardo in MS, called the Cerrado Project, with a production capacity of 2.55 million tons of eucalyptus pulp per year.
-
Cerrado - PD (Drying)
Civil project of the Drying Area, comprising excavation projects, direct and deep foundations, dynamic analysis of equipment base, in-situ and precast concrete superstructures, metal roofing, rainwater drainage, contaminated and hydrosanitary, street...
-
Cerrado - RBPB
Civil project of the "Recovery and power boilers", in the chemical recovery area, of the largest mill in the pulp segment in the world.
-
Cerrado - WLP & GAS
Civil project for the “Caustification and Lime and Gasification Furnace”, in the chemical recovery area, of the mill factory in the pulp segment in the world.
-
Cerrado - Wood Yard
Wood yard (200,400 m²) for the pulp and paper industry in the municipality of Ribas do Rio Pardo in MS, called the Cerrado Project, with a production capacity of 2.55 million tons of eucalyptus pulp per year.
-
Cerrado Project
Basic civil detail engineering - layout, mechanics, piping, metallic structures, instrumentation, automation, electrical and fire prevention and fighting project, for the Suzano Cerrado project - fiber line.
-
FL - Capacity Increase II
Increase in Capacity 2 of the Fiber Line of Klabin's PUMA 1 project, located in the municipality of Ortigueira, PR.
-
Jacareí - ASH and MVR
Civil project to modernize the “ASH Leaching and MVR”, in the chemical recovery area, at the Jacareí factory in the pulp segment, with an investment of 2 billion reais.
-
Jacareí - Fiber Line
Modernization of the C Fiber Line at the Suzano plant in Jacareí/SP.
-
Klabin - Puma I
Capacity Increase II Project - EUCA Line - Fiber Line - Klabin Puma I
-
Suzano Jacareí
Basic civil engineering & layout, mechanics, piping, automation, electrical, instrumentation, for the Suzano Jacareí project # ale line plant (ASH Leaching) and MVR.
-
VERTERE
New Pulp and Retro-Area warehouse in the Port of Santos.