Açu Port
Delivery Centre Açu's Test Bench.
-
Auxiliary Utilities - COMPERJ
Technical verification of the original executive project, consistency analysis of the basic project of the New Compressors, complementation of the executive project for, Civil Construction,
-
Barbados - Silo Replacement
Due to the structural compromise of the existing metallic storage silos, and as the factory operation cannot stop, this project foresees the execution of a new base for the installation of new metallic silos.
-
Cerrado Project
Basic civil detail engineering - layout, mechanics, piping, metallic structures, instrumentation, automation, electrical and fire prevention and fighting project, for the Suzano Cerrado project - fiber line.
-
COMPERJ Torch Unit
Flare Unit (Torch) of the COMPERJ UPGN.
-
Cooling Towers - COMPERJ
Unit U-5601 (Block 1 cooling water system - 224,000 m³ / h) SE-5601 Substation (258 MW) Unit U8112-007 (scheduled stop area)
-
ETO-RCD
Preparation of projects, supply of computerized systems, and provision of services necessary for contracting related to the implementation of the enterprise.
-
Fluid Laboratory
Fluid Laboratory of the Tube Park
-
Gavião Preto
Gavião Preto (GVP) is a gas production field that will start production in 2022. For the development of this field, it will be necessary to build 6 clusters of wells (Cluster 1, 2, 3, 4, 5 and 6),
-
General Engineering RJ/SP
Umbrella project signed between Braskem and OTZ for the Provision of General Engineering Services for Business Units in the state of Rio de Janeiro
-
GRANIHC
Provide customer support in the engineering detail project, implement As-Built in the documentation and 3D Model and technical support for the works on the P-68 Platform.
-
Ipiranga
Provision of multidisciplinary engineering services for the elaboration of Executive Projects related to Ipiranga's operational units
-
Klabin - Puma I
Capacity Increase II Project - EUCA Line - Fiber Line - Klabin Puma I
-
Linde Gases Factory
Construction of the new Linde Gases unit in Santa Cruz (Industrial Zone), RJ.
-
Modules 2, 3 and 7 of the P 75 and P77 (FPSO)
FPSO - Oil production = 24,000 m³/day. Module 2 - CO² Compression Module 3 - Export Gas Compression Module 7 - Injection Gas
-
Modules for P-75 and P-77
FPSO - Oil production = 24,000 m³/day. Module 6 - Gas Dehydration Module 8 - H2S Removal Module 14 - Chemicals
-
New Helideck
The P-53 is an FPU that was installed in October 2008 in the Marlim Leste field, and since then, due to the relative position between the houses and the helipad...
-
PERENCO - Adequacy of Drainage System
Adequacy of the rainwater drainage systems of the Campos de Vermelho (PVM-1 and 3) and Carapebas (PCP-2) platforms.
-
Replicating FPSOs
Engineering Project for Petrobras FPSOs - P-68 and P-70.
-
RNEST (Abreu e Lima Refinery)
Executive Engineering, 3D Modeling (PDMS) and As-built.
-
RPBC - Replacement of UCP2 Reactors
Project to Replace the UCP2 Reactors with the objective of replacing the current reactors of the Coke Unit 2 of the RPBC.
-
Segregation TK-309
Segregation of the existing TK-309 tank to enable its use as a storage tank for a new product.
-
Suzano Jacareí
Basic civil engineering & layout, mechanics, piping, automation, electrical, instrumentation, for the Suzano Jacareí project # ale line plant (ASH Leaching) and MVR.
-
ULTRAGAZ
Project for the construction of the LPG Purification Unit.
-
UO-BC
Engineering for Campos Basin Operational Unit.
- 1
- 2