Sector
Oil & Gas
Project Code
303
Powerhouse (200 MW) - CAFOR (U-50) and its substations (SE-5010 and SE-5000)
Input substation (SE-5500)
Compressed Air Unit (U-57)
"Island" substations (SE-5020, SE-5030, SE-5040 and SE-5050)
Quantities:
- 2 Oil boilers: 450 ton/h - 120 kg/cm² - 560oC;
- 4 Turbogenerators of 50 MW;
- 4 Surface Condensers;
- 4 Deaerators;
- Complete substation / 4 13.8/230kV step-up transformers;
- Pipe-Rack in reinforced concrete (120 m).
Service Performed
Multidisciplinary Engineering - Detailed / Executive
Scope:
Executive Engineering, 3D Modeling (PDMS) and As-built.