Idioma | Language


  • Auxiliary Utilities - COMPERJ

    Technical verification of the original executive project, consistency analysis of the basic project of the New Compressors, complementation of the executive project for, Civil Construction,

  • FPSO Cidade Maricá

    FPSO Cidade Maricá

  • MSA Engineering Services

    Master service agreement for engineering services

  • PERENCO - Rainwater Drainage

    Contracting Process for Electromechanical Assembly of the Pluvial Drainage Systems of the Platforms of Campos de Vermelho (PVM-1/2/3), Carapebas (PCP-1/2/3) and Pargo (PPG-1).

  • Process Simulation

    Studies for the implementation of a pilot plant for the recovery of propane.

  • Steel Bridges

    Metropolitan Arch Metallic Bridges - 10 metal bridges with a width of 13.3 meters each, totaling a length of 665.4 meters. The structure's total weight is approximately 5,634 tons of steel, with spans of 50m (1x), 52.7m (2x), 60m (4x) and 90m (3x).

  • Tesália Paulistana Wind Power Project

    Wind Power Station 200 MW

  • UPGN Ruote III

    Detailing and 3D Modeling Project (E3D).


Results 1 - 8 of 8
OTZ Engenharia
NEWSLETTER
Please fill the required field.
Please fill the required field.

Com este canal de comunicação buscamos estreitar ainda mais a relação com Clientes, Fornecedores e Parceiros.

Rua da Lapa, 180 / 5° – Centro
Rio de Janeiro - RJ - Brasil

+55 (21) 2224-8774

+55 (21) 99961-3365 (WhatsApp)