- 
	COMPERJ - Route 3Rota 3 natural gas processing unit. 
- 
	Coque Off-site Torch and Interconnection System - REDUC (Duque de Caxias Refinery)12 bridges with widths of 3.3m, 6.35m, and 10.22m, totaling an extension of 128.25 meters to span spans of 8m, 8.40m, 8.50m, 8.82m, 9m, 9.90m, 10m, 10.20m, 10.5m, 10.90m, 11.96m, and 22.6m. 
- 
	Railway Works - Bridges8 bridges, six railway bridges and two road bridges from the EMT-01 to EMT-05 section of the Transnordestina Railway. 
- 
	Road Bridge - DamBridge with a length of 1.3 km and a width of 10.80 m over the reservoir of the De Mascarenhas De Moraes Hydroelectric Power Plant, which will integrate the MG-856 highway. 
- 
	Steel BridgesMetropolitan Arch Metallic Bridges - 10 metal bridges with a width of 13.3 meters each, totaling a length of 665.4 meters. The structure's total weight is approximately 5,634 tons of steel, with spans of 50m (1x), 52.7m (2x), 60m (4x) and 90m (3x). 
 
										 
										 
										