Idioma | Language


  • Auxiliary Utilities - COMPERJ

    Technical verification of the original executive project, consistency analysis of the basic project of the New Compressors, complementation of the executive project for, Civil Construction,

  • CCTV Metro Sao Paulo

    Installation of the CCTV System in 16 stations of the São Paulo Metro.

  • ETO-RCD

    Preparation of projects, supply of computerized systems, and provision of services necessary for contracting related to the implementation of the enterprise.

  • Gavião Preto

    Gavião Preto (GVP) is a gas production field that will start production in 2022. For the development of this field, it will be necessary to build 6 clusters of wells (Cluster 1, 2, 3, 4, 5 and 6),

  • Imboassica Pipe Park

    Internal and external renovation of administrative buildings 501 and 502.

  • Inhaúma Shipyard

    Renovation and adaptation of a 2-story building for office occupation.

  • Ipiranga

    Provision of multidisciplinary engineering services for the elaboration of Executive Projects related to Ipiranga's operational units

  • Modules for P-75 and P-77

    FPSO - Oil production = 24,000 m³/day. Module 6 - Gas Dehydration Module 8 - H2S Removal Module 14 - Chemicals

  • MSA Engineering Services

    Master service agreement for engineering services

  • PROSUB - PHASE 3

    Electronic and/or automation systems projects for the Integrated Control Center (CIC) at the Madeira Island Submarine Base (BSIM).

  • UTP - Açu Petróleo

    Quantitative Engineering (MTO) in addition to a Critical Analysis of the main systems of the AÇU PETROLEO Oil Treatment Unit.


Results 1 - 11 of 11
OTZ Engenharia
NEWSLETTER
Please fill the required field.
Please fill the required field.

Com este canal de comunicação buscamos estreitar ainda mais a relação com Clientes, Fornecedores e Parceiros.

Rua da Lapa, 180 / 5° – Centro
Rio de Janeiro - RJ - Brasil

+55 (21) 2224-8774

+55 (21) 99961-3365 (WhatsApp)