Gavião Preto (GVP) is a gas production field that will start production in 2022. For the development of this field, it will be necessary to build 6 clusters of wells (Cluster 1, 2, 3, 4, 5 and 6), the collection ducts, installation of the Gavião Preto Production Station (EPGVP), and the flow duct that will send the production from the field to the UTG.
Only Cluster 1 will be located within the EPGVP. The other Clusters will have their production sent to the station through pipelines.
Cluster 2 will have a test pipeline, in addition to the production pipeline, connected directly to the EPGVP.
Service Performed
Multidisciplinary Engineering - Basic, Multidisciplinary Engineering - Detailed / Executive
Scope:
Consistency analysis of the basic project and preparation of the executive project.