Due to the structural compromise of the existing metallic storage silos, and as the factory operation cannot stop, this project foresees the execution of a new base for the installation of new metallic silos, the removal of the existing silos to replace them, taking advantage of the existing base. , and the installation of new conveyors and Transfer Towers.
Service Performed
Multidisciplinary Engineering - Detailed / Executive
Scope:
Metal supports for conveyor belts, platforms, and metal ladders. Piping for the compressed air system. Detailing of silos discharge chutes and conveyor belts.