Coque Off-site Torch and Interconnection System - REDUC (Duque de Caxias Refinery)

Metal bridge for crossing the Main Flare line (ø = 54”), the Chemical Flare (ø = 12”), and its utilities, to span 34 meters.

Main Quantitative  

  • Precast piles: 20 units x 570m in length
  • Structural concrete volume: 45m³
  • Forms: 268m²
  • CA-50ª steel weight: 8074 kg
  • Inserts: 146 Kg
  • Metal Structure: 25000 kg

Service Performed

Multidisciplinary Engineering - Detailed / Executive

Scope:

Executive Project