Sector  
		
                    Oil & Gas          		  
        
          Project Code  
		
                    2291          		  
        
      Metal bridge for crossing the Main Flare line (ø = 54”), the Chemical Flare (ø = 12”), and its utilities, to span 34 meters.
Main Quantitative
- Precast piles: 20 units x 570m in length
- Structural concrete volume: 45m³
- Forms: 268m²
- CA-50ª steel weight: 8074 kg
- Inserts: 146 Kg
- Metal Structure: 25000 kg
Service Performed
Multidisciplinary Engineering - Detailed / Executive
Scope:
Executive Project
 
										 
										 
										 
				