Sector  
		
                    Oil & Gas, Port & Maritime          		  
        
          Project Code  
		
                    444          		  
        
      Modernization of the terminal with the construction of New Dolphins to support ship mooring loads of up to 25,000TPB with a maximum traction force of 1,000kN and the interconnection by access walkways of the existing mooring and berthing dolphins.
Service Performed
Multidisciplinary Engineering - Basic
Scope:
Basic project of the new mooring dolphins and access walkways.
 
										 
										 
										 
				