Implementation of the Ilha Comprida Waterway Terminal: Support Pier, Service Ramp, Ball Base, Tank Base (including wall for containment basin), Pipe-Rack, Substation, and Administrative Building.
Renovation and modernization of operating platform installations and systems with replacement and inclusion of equipment.
Modernization of the terminal with the construction of New Dolphins to support ship mooring loads of up to 25,000TPB with a maximum traction force of 1,000kN...
Characterization of the waste generated, currently packed in sealed concrete boxes, for washing and cleaning parts contaminated with oil and chemicals.
The P-53 is an FPU that was installed in October 2008 in the Marlim Leste field, and since then, due to the relative position between the houses and the helipad...