Idioma | Language

PERENCO - Rainwater Drainage

PERENCO - Rainwater Drainage

Contracting Process for Electromechanical Assembly of the Pluvial Drainage Systems of the Platforms of Campos de Vermelho (PVM-1/2/3), Carapebas (PCP-1/2/3) and Pargo (PPG-1).

Replicating FPSOs

Replicating FPSOs

Engineering Project for Petrobras FPSOs - P-68 and P-70.

PROSUB - PHASE 3

PROSUB - PHASE 3

Electronic and/or automation systems projects for the Integrated Control Center (CIC) at the Madeira Island Submarine Base (BSIM).

Gavião Preto

Gavião Preto

Gavião Preto (GVP) is a gas production field that will start production in 2022. For the development of this field, it will be necessary to build 6 clusters of wells (Cluster 1, 2, 3, 4, 5 and 6),

Auxiliary Utilities - COMPERJ

Auxiliary Utilities - COMPERJ

Technical verification of the original executive project, consistency analysis of the basic project of the New Compressors, complementation of the executive project for, Civil Construction,

Process Simulation

Process Simulation

Studies for the implementation of a pilot plant for the recovery of propane.

OTZ Engenharia
NEWSLETTER
Please fill the required field.
Please fill the required field.

Com este canal de comunicação buscamos estreitar ainda mais a relação com Clientes, Fornecedores e Parceiros.

Rua da Lapa, 180 / 5° – Centro
Rio de Janeiro - RJ - Brasil

+55 (21) 2224-8774

+55 (21) 99961-3365 (WhatsApp)