Infrastructure
The P-53 is an FPU that was installed in October 2008 in the Marlim Leste field, and since then, due to the relative position between the houses and the helipad...
The P-53 is an FPU that was installed in October 2008 in the Marlim Leste field, and since then, due to the relative position between the houses and the helipad...
Preparation of layouts and 3D modeling of 17 process skids, considering the rigging and logistics equipment available.
Internal and external renovation of administrative buildings 501 and 502.
Executive Engineering, 3D Modeling (PDMS) and As-built.
Com este canal de comunicação buscamos estreitar ainda mais a relação com Clientes, Fornecedores e Parceiros.
Rua da Lapa, 180 / 5° – Centro
Rio de Janeiro - RJ - Brasil
+55 (21) 2224-8774
+55 (21) 99961-3365 (WhatsApp)